Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
DATA CENTER
[NAME]
ACHIEVEMENTS
We at Power Teck Engineering are actively part of a number of existing industries in Brunei. These would include the Main Switchboard for the National Isolation Centre in Tutong which was completed in 10 days and as for the Control Panels it was completed within the span of 2 weeks.
Our foot print can also be traced to a number of locations such as Heng Yi Pulau Muara Besar, Meragang Housing Scheme, Kementerian Hal Ehwal Ugama Building, The New RTB Building located in Sungai Akar, Western Parallel Taxiway of the Brunei International Airport and many more.
600 A, MAIN SWITCHBOARD FOR NIC LABORATORY FOR NTRL AND VIROLOGY SERVICES
To solidify our capabilities, we at Power Teck Engineering has tested the design of a fully “modular” design of a switchboard within the territories of Australia which ended in the success of all 7 critical test using the same exact switchboard. Not long after we have even upgraded the existing short-circuit test from the levels of 50KA to 65KA.
Due to these events, we are confident in our abilities to perform and meet the requirements of our customers.